Download PDF version

Always looking for innovative solutions that save installers time and money, Scolmore introduces this inventive product as part of the CLICK® Essentials range.

StudBox® is a universal first fix electrical back-box system for dry lining applications which will significantly reduce installation time.

About StudBox®

There are 3 products within the StudBox® range – 1 Gang, 2 Gang, and the Universal StudBox® It replaces the time-consuming and tedious practice of installing metal back boxes into stud walls attached to timber noggins, and will typically reduce the installation time down from five minutes to 30 seconds. There are plasterboard marking points on the corners of each StudBox® cavity which provide the exact position to cut out without the need for measuring.

There are 3 products within the StudBox® range – 1 Gang (120mm – 600mm centers), 2 Gang (130mm – 600mm centers), and the Universal StudBox®.

Design and Features

The Universal StudBox® (SB6IN1) has integrally molded mounting flanges so that it can be hung between the faces of timber studs with centers between 380 and 450mm in a matter of seconds. The overall length of the box is 450mm long, so there is no need to measure the height from the floor on stud work.

With the universal StudBox® marked at height, the first screw is inserted and an integral spirit level allows for exact horizontal alignment - without the need for a separate tool - ready for the second screw to go in.

Installation requirements

The universal StudBox® (380mm – 450mm centers) has one twin and two single cavity boxes, all 35mm deep which gives six possible mounting combinations and will cover most installation requirements. If just a single or twin box is needed, then it’s simply a case of cutting the studs off the box cavity not being used with snips and boarding over them.

Manufactured in the UK, Scolmore is the exclusive supplier for the StudBox® range of products.

Download PDF version Download PDF version

In case you missed it

Delta AI-Driven Energy Solutions 2025
Delta AI-Driven Energy Solutions 2025

Delta, a global pioneer in power management and smart green solutions, highlighted at Hannover Messe 2025 a versatile set of AI-driven smart manufacturing, energy infrastructure, a...

Solar & Storage Live Malaysia 2025: Energy Transformation
Solar & Storage Live Malaysia 2025: Energy Transformation

Solar & Storage Live Malaysia 2025 launches in Kuala Lumpur on 9 and 10 April 2025, aimed at helping Malaysia make significant strides towards a more sustainable future and mee...

NR's GTSDC System Solves Turbine Vibration Issues
NR's GTSDC System Solves Turbine Vibration Issues

On June 7, 2021, the generator terminal subsynchronous damping control (GTSDC) system of Datang Xilinhaote (Xilinhot) power plant completed the oscillation suppression test and put...

vfd