Download PDF version

The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm.

The monthly generation of November of Y8 is around 2,400MWh.

wind turbine integration grid

Moreover, the total generation after grid-on half a year ago is around 11210MWh, while the equivalent generation hours of the above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. 

The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency, and reliability of My SE5.5-155 wind turbines.

Download PDF version Download PDF version

In case you missed it

TE Expands In Utilities Market With Richards Acquisition
TE Expands In Utilities Market With Richards Acquisition

TE Connectivity plc, a world pioneer in connectors and sensors, has entered into a definitive agreement to acquire Richards Manufacturing Co. from funds managed by Oaktree Capital...

Delta's Energy Storage Innovations Unveiled At Energy Storage Summit 2025
Delta's Energy Storage Innovations Unveiled At Energy Storage Summit 2025

Delta, a pioneer in power management and IoT-based smart green solutions, will unveil its latest energy storage innovations at Energy Storage Summit 2025, a pioneering European eve...

GSL Electric Transforms SLC Airport's South Concourse
GSL Electric Transforms SLC Airport's South Concourse

Salt Lake City International Airport (SLC) is the 21st busiest airport in the United States and Delta Air Lines' fourth-largest hub. The Salt Lake Department of Airports has been b...

vfd