Download PDF version

The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm.

The monthly generation of November of Y8 is around 2,400MWh.

wind turbine integration grid

Moreover, the total generation after grid-on half a year ago is around 11210MWh, while the equivalent generation hours of the above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. 

The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency, and reliability of My SE5.5-155 wind turbines.

Download PDF version Download PDF version

In case you missed it

Eaton Names Lucy Clark Dougherty As New General Counsel In 2025
Eaton Names Lucy Clark Dougherty As New General Counsel In 2025

Intelligent power management company - Eaton announced that Lucy Clark Dougherty has been named General Counsel, effective January 27, 2025. Dougherty will succeed Taras 'Terry' Sz...

Mitsubishi And Synspective SAR Satellites For Security
Mitsubishi And Synspective SAR Satellites For Security

Mitsubishi Electric Corporation announced that it acquired a stake in Synspective Inc., a Tokyo-based startup company that develops and operates small synthetic aperture radar (SAR...

Mitsubishi Electric Acquires Crystal Air For IT Cooling
Mitsubishi Electric Acquires Crystal Air For IT Cooling

Mitsubishi Electric Corporation announced that its wholly-owned subsidiary Mitsubishi Electric Europe B.V. concluded an agreement on December 18 to acquire all shares of Crystal Ai...

vfd