Download PDF version

Following successful refueling, Axpo brought Unit 2 of the Beznau nuclear power plant (KKB) back online during the course of August 22, 2022.

With the new loading of the reactor core at the Beznau nuclear power plant, KKB 2 (Unit 2) is starting the next operating cycle and will once again produce electricity around the clock for more than 600,000 four-person households.

Unit 2 of the Beznau nuclear power plant back online

Unit 2 of the Beznau nuclear power plant (KKB 2) has now gradually resumed power operation

Unit 2 of the Beznau nuclear power plant had gone offline on August 8, 2022, as scheduled for annual refueling. Over the past two weeks, specialists at KKB have replaced 20 of the total of 121 fuel assemblies in the reactor core. In addition, inspection work, system tests and planned maintenance work were also carried out on individual components.

Following clearance by the Swiss Federal Nuclear Safety Inspectorate - ENSI, Unit 2 of the Beznau nuclear power plant (KKB 2) has now gradually resumed power operation. The plant will reach full load capacity (365 megawatts net output) in about two days.

Safe operation

During restart, water vapor is visible above the non-nuclear part of the power plant (machine house) at times.

However, the Beznau nuclear power plant authorities confirmed that there is no danger to people or the environment.

Download PDF version Download PDF version
  • Related companies
  • Axpo
  • View all news from
  • Axpo

In case you missed it

Mitsubishi And Synspective SAR Satellites For Security
Mitsubishi And Synspective SAR Satellites For Security

Mitsubishi Electric Corporation announced that it acquired a stake in Synspective Inc., a Tokyo-based startup company that develops and operates small synthetic aperture radar (SAR...

Mitsubishi Electric Acquires Crystal Air For IT Cooling
Mitsubishi Electric Acquires Crystal Air For IT Cooling

Mitsubishi Electric Corporation announced that its wholly-owned subsidiary Mitsubishi Electric Europe B.V. concluded an agreement on December 18 to acquire all shares of Crystal Ai...

Ameren Announces Steven O. Vondran Appointed To Company's Board Of Directors
Ameren Announces Steven O. Vondran Appointed To Company's Board Of Directors

Ameren Corporation announced that Steven O. Vondran has been elected to the Ameren Board of Directors, effective January 1, 2025. He is the President and Chief Executive Officer o...

vfd